Thursday, November 18, 2010

Geothermal Energy

Today we presented our project along with several other groups.  It was interesting to see how the Banana Boat was interpreted by other students.  So far we were the only group who chose a new building for the site, while some of the other groups made more significant changes to the concept such as the Art Bar group.  


After having done extensive research on mechanical systems, it was helpful to see how the mechanical engineers from the other groups solved the mechanical issues for their projects.  I consulted the textbook, but other sources were hard to filter through as I was not sure which systems could be applied to our climate or which were applicable to our building design.  Some of the confusion was also most likely due to the fact that geothermal energy is a relatively new source of energy, and varying sources used different titles to describe the same terms.  


My knowledge on geothermal energy, as well as mechanical systems in general has been enriched because of this project.  In order to keep this knowledge fresh in my mind, this blog will go over the most important points that I learned.  


-Geothermal energy is an initially expensive, but in the long term, money saving system.


-Geothermal energy is a truly renewable source.


-Geothermal energy is most effectively extracted from the earth in areas along the fault line.


-Geothermal energy works by taking the natural heat and cool from the earth through ground loops.


-These ground loops connect to heat pump, then to an air handler in order to heat or cool the home.  


-This type of energy reduces the amount of HVAC equipment needed as the system can both heat and cool rather than needing separate systems.


http://gaci.biz/geothermal

-There are several different types of geothermal energy such as; ground loop heat pump systems, surface water heat pump systems, groundwater heat pump systems and hybrid geothermal systems.  


-Geothermal energy can be used to supply heat, cooling and electricity.


This project will help me have a more well rounded understanding of electrical, mechanical, LEED and interior design systems with projects in the future.  I am glad we had the chance to work as a group to learn about each system.  


Natasha Bargen
Mechanical Engineer

Indoor Systems 1 - Blog 5 (Final)

Our concept and design for Bloom has at long last be finalized! We hoped to replace the Banana Boat with a business that retained loyal customers and gained new ones in the area, through an expansion of services that would better serve the entire community. I believe that through in-depth research and careful planning we were able to successfully achieve this. As one of the LEED Consultants, it became evident early on in the process that there was a lot of information to learn in terms sustainability and green building practices; in addition to design, mechanical, and electrical engineering. There was so much information that we would not be able to cover it all in our presentation. For example, a water catchment irrigation system was designed to function along side the planted roof where water is collected for irrigation. A building with a rainwater harvesting system has the potential to garner up to seven LEED points: 

-1 point: Installing above-code measures that result in 20 percent water savings.
-1 point: Installing above-code measures that result in 30 percent water savings (typically waterless urinals or other unusual measures).
-1 point: Installing above-code measures that result in 40 percent water savings (rainwater harvesting system or other water re-use).
-2 points: Storm water reduction (storm water management practices).
-2 points: Water-efficient irrigation
-1 point: Reducing the project’s sewage generation from use of potable water by 50% or more.

With a well-designed filtration system, a water catchment system can take care of all the cafĂ©’s water uses. Benefits include self-sufficient water supply, as well as reduce erosion, flooding, and pollution caused by runoff. When snow or rainfall hits impermeable surfaces, such as parking lots, roofs and walkways, it runs off, carrying with it oil, gasoline, detergents, pesticides, garbage and other pollutants, this ‘natural filter’ is also great for health and vegetation. Not to mention, filtered water also costs substantially less than bottled water.

Diagram illustrates a basic water catchment and storage system:

-Ashley W. (PM)

LEED Consultant/ Interior Designer

Final Blog! - Electrical Systems

The concept design for Bloom is now complete! Though it was long, intense process, our group managed to design a space, integrating the mechanical and electrical systems with the interior design of the space as well as great consideration for the environment.
Throughout this process I learned a lot about lighting design, and found it extremely beneficial to take on this role.  Lighting was an area of interior design I was a little unfamiliar with, yet something i was definitely interested in learning more about.
For Bloom I took the time to calculate how much lighting would be needed in the interior.  I did so using the simple lumen method of calculation.  With the plans laid out in front of me and lamps and fixtures open on my computer screen, I was able to determine an approximate number of lamps needed in each room in Bloom.  With this is mind I chose recessed lighting and fluorescents to provide this recommended illumination to the space.  With the concept in mind, I chose decorative fixtures to add interest to the space as well as to emphasize elements, such as the cash wrap and tables.


The team had to work closely together to ensure all systems worked well together.  Working with the Interior Designer, I made sure the lighting and furniture were cohesive.  The mechanical engineer and I ensured that the mechanical systems did not interfere with any light fixtures or electrical outlets.  It was quite the process, but in the end I think we designed a space that emphasizes Environment, Well-being, Community and Re-birth.


Stephanie Hill
Electrical Engineer

Wednesday, November 17, 2010

Blog_Final

Well Tomorrow is the big presentation day and the group really pulled through.  Through this process I feel I learned a lot about how a LEED consultant is involved through many aspects of the design process. Decisions at all levels of scale can have major repercussions on the environment. Decisions on building placement, systems, finishes and furniture can all have major effects on the environment throughout the life cycle of the building. 


Something that I had never done before, but found very useful was the code analysis. For our proposed building I calculated the space required per person for spaces of different function including: 



Kitchen: 300 sq ft (30.5 sq ft per person) = 9.8 persons
Public Corridors: 120 sq ft (12 sq ft per person) = 10 persons
First and Second Story: 1,631 sq ft (12 sq ft per person) = 135 persons
Other Stories: 645 sq ft (18 sq ft per person) = 35 persons
Outdoor Patio: 451 sq ft (12 sq ft per person) = 37
Total Occupancy: 226 persons
Restaurant Seating: 60 persons

I decided to research solar panels (photovoltaic cells) as a way of introducing an off grid energy source.  As a starting guide I looked up the US Department of Energy's information on average energy use for the average house. I found out that the average house used 8,900 Kwh per year which mean 8,900,000 watts per year! Most commercially available solar panels produce between 1 and 12 amps per panel, so the average output is likely to be 127 watts per panel. Calculating with 6 average daylight hours the average house would need 30-40 panels! Considering panels come in 3'x6' or 5'x5'  and our site was quite small, I decided it would be more effective to diversify the roof rather than cover the entire roof surface. 

Signage is another section of the project I found interesting. I think that spreading awareness of 'green' systems is important. Although through our education in the ED program we hear about the imortance of them all the time, students in other faculties may not. So Signage can play a role to educate users of the "Bloom" space. As a way to achieve LEED innovation credits, The signage will be used to educate building users about the sustainable features of the building. Our interior signage would include information on features including: commissioning controls, HVAC, rooftop design, and low flow fixtures.  


Cliff G
LEED 


Monday, November 15, 2010

PROGRESS - 2

As we approach our deadline our project is really coming together. It has been interesting to see how important it is for all group members to work together and co-ordinate tasks.  It has shown me how integrated the mechanical, electrical and LEED roles are with the design of the actual building.

I have been primarily focusing on creating a space that will be functional and enjoyable for a variety of individuals to use.  Inclusive, or accessible design is something we have been looking into.  According to the CNIB website Canadians with disabilities account for $25 Billion dollars a year – which is an interesting way to look at inclusive design- as though it is good for business. 
Considering we are creating a space that is meant to benefit communtiy are committed to creating a space that will be fitted with an accessible washroom, seating as well as providing menus and means for egress for individuals whose vision and or hearing are impaired. 
My role is to develop circulation paths as well as means of egress for individuals that will be integrated seamlessly with our design.
I have also been sourcing furniture that is sustainable and have been pleasently surprised to see the wide array of manufactures who are making an effort to create products that will benEfit their user while at the same time make as little of a environmental footprint as possible. 
-PROF INTERIOR DESIGNER

PROGRESS

We are currently progressing through our redesign of the Banana Boat.  As my role of Interior Designer I have been spending time researching different materials that are sustainable, interesting and that can inject something special into our design.

Throughout my research I stumbled upon an interesting new type of Gymsum board that promises to take VOC's out of the air.  Made by CertainTeed the product is called AirRenew and uses technology to convert VOC's into safe compounds.  The boards have the ability to capture these toxins and trap them into the air.

Not only are the boards capable of removing VOC's but the M2Tech provides enhanced moisture and mold resistance which has rendered it a recepient of the best possible score – of zero – for mold resistance.  This is important for a public space where food is prepared. 

I look forward to incorporating this new and innovative product into our design.

I am also looking at local materials that are interesting and might be applicable in our design.  Initially I was drawn to the traditional limestone which to me seems very Manitoba.  However I am currently being drawn towards reclaimed brick – thanks to it's many sustainable benefits such as it's thermal mass and the fact that it is 100% recyclable.  Using reclaimed brick also contributes to LEED accreditation. 

-PROF INTERIOR DESIGNER

CHARETTE

This week our group had a charette to discuss potential programatic considerations for our upcoming re-design of the Banana Boat site. 

Our first step was to define our users, which we imagine to be individuals from the community, individuals who are working in the nearby MTS building and the occasional passer by – be it on foot, bike or vehicle.

We then looked at the surrounding community to identify gaps in services offered.  We were concerned by the lack of access to fresh health food in the city.  Although we were able to identify a few places offering such a menu none are located in the South Osborne area.  We imagined that by replacing such an exciting and well-known land mark we would have the opportunity to change people's eating habits and introduce them to a healthier life-style.

As a group we made the decision that we will tear down the existing structure, attempt to salvage as much as we can and re-build using appropriate techniques in regards to sustainability.  I plan on using my role as interior designer to source appropriate materials, furnitures and fixtures that will meet our aesthetic and ecological goals.  I also am looking to create a space that maintains a strong connection to the community. 

-PROF INTERIOR DESIGNER

MANITOBA HYDRO BLOG

This past week our class had the opportunity to visit the Manitoba Hydro Building.  Elegant and efficient the building is paving the way for more exciting, and sustainable design in Winnipeg and is generating excitement world-wide.

From the perspective of Prof. Interior designer I could not help but be impressed by the overall feeling that was created within the space.  The first thing you notice is the air, crisp clean and fresh the access to fresh air and proper ventilation throughout the space contributes to the overall health of the employees. The westward curtain wall provides tons of natural day light reducing the need for harsh overhead fluorescents. 

Stairwells throughout the building link floors together and create common areas that act as interior garden courtyards.  The courtyards work to separate spaces and also help to reduce travel time to meetings.

The outcome of Hydro's commitment to sustainability is a more productive happy and health workforce  Being a visitor throughout the space, who has experience working in an office setting, the feeling of productivity is palpable.  Being in such a well-lit, airy space encourages people to do their job and having such a nice place to do encourages them to do their job well. 

-PROF. INTERIOR DESIGNER

Friday, November 12, 2010

Indoor Air Quality

Indoor air quality is important to the "V" in HVAC; ventilation.  Indoor air quality has always been a term that I assumed was about the basics of getting fresh air and avoiding any materials or equipment that may expel toxins into an interior setting.  While this is true, I did some research to understand IAQ on a more specific level.


According to Maryrose McGowan's Interior Graphic Standards, air quality is essential for comfort and productivity and most importantly, IAQ promotes good health.


Indoor Air Quality will be compromised if:
-inadequate ventilation doesn't provide enough outside air
-chemicals used in cleaning and office products get trapped inside a building
-outdoor pollutants enter and are trapped inside
-mold or other microorganisms grow, multiply and disperse particles through heating, air conditioning and ventilation systems 
Diagram of HEPA filter. http://en.wikipedia.org/wiki/File:HEPA_Filter_diagram_en.svg
In order to filter out gases and particles we need to use:
-lower efficiency filters
-high-efficiency particulate-arresting (HEPA) filtration
-absorption with activated carbon

Filters are placed in the ducts at various points to stop particles from passing through.  There are two
types of commonly used filters:
-woven fiberglass filters which have a lower density weave, air flows more freely through them so smaller fans are needed and less energy is needed, however they only trap larger particles and fewer of them.

-HEPA filters which catch 99.97% of all particles, made from a single sheet of water repellent fiber that is pleated to provide more surface area, because they are more densely woven, they require larger and more energy intensive fans, making their cost greater expense economically undesirable in buildings, also noisier because of larger motors, they are usually used in spaces that are especially sensitive to contamination. For example; an operating room.

The decision between the types of filters depends on the project's budget and the typology of the project.  Indoor air quality is something we can not see, therefore may sometimes be forgotten about, but is a major consideration for interior designers.    

Natasha Bargen
Mechanical Engineer


source: Maryrose McGowan's Interior Graphic Standards, page 99. 




Thursday, November 11, 2010

Blog 4 - electrical systems

Over the past couple weeks I have been researching daylighting and interior lighting methods for our cafe.  Working with the LEED consultants, we have determined that daylighting will have a large effect on the lighting design for the space.  By placing large windows at the front of the building, we hope to minimize the amount of electrical light necessary during the day.  To implement this, open loop system solar sensors will measure the daylight and control the electric lighting.  A uniform lighting level will be maintained.



Light and heat gain can also be controlled through windows.  Thermochromic glass darkens when it is warmed by the sun,  Photochromic glass turns darker when exposed to bright light, and electrochromic glass is controlled by an electronic switch that adjusts its darkness.  In our cafe, photochromic glass may be beneficial for the south facing windows.



I will also consider use of "smart" automated interior shading devices.  These blinds or shades respond to changing solar conditions using sensors.  Light shelves may also be installed to maximize light exposure indoors.  Combined with exterior overhangs, heat gain is reduced, especially during the summer months.
Another important design consideration is the appliances and equipment.  We will be sure to specify products that have an "Energy Star" rating.

Stephanie Hill
Electrical Engineer

Monday, November 8, 2010

Blog 4_Material Research & Case Study

As the LEED "certified professional" I made an effort in the last weeks to gather information about newly developed and sustainable materials as well as a case study for a Retail space that met USGBC's Platinum rating. 


The precedent study I did was on the Chipotle Mexican Grill in Gurnee Mills, Illinois. This project ended up with 33% energy savings,  43% water savings, and 86% of construction waste was diverted from the landfill. 


Chipotle seeks for integrity in its food and its operation of restaurants. They wanted the restaurant industry to be represented under the LEED retail program. This project had two major goals: Increasing energy efficiency and installing a source of on-site renewable energy. Because this restaurant is located in a area with high wind they installed a 6-kilowatt wind turbine which provides power for lighting and contributes to overall energy savings. 


This project eliminated the use of potable water for landscaping and installed a 2,500 gallon cistern to collect rainwater for native plantings and invested in highly efficient interior water fixtures. Educating its staff and the public about green building is a priority of Chipotle. Employees attend formal crew trainings on sustainability and are trained to recycle glass, plastic and cardboard. 


Here are some of the project details:



Architect: Wilkus Architects 
Civil Engineer: Landform
Owner: Chipotle Mexican Grill 
Contractor: Galant Construction 
MEP Engineer: National Engineering 
Landscape Architect: Landform 
LEED Consultant: Green Building Services 
Structural Engineer: LS Engineers 
Commissioning Agent: Chipotle Mexican Grill 
Project Size: 2,216 square feet


 This Cork material can be grouted as flooring or wall covering and has great sound absorption. Cork  is one of the most eco-friendly materials around but it usually comes in large tiles that can be awkward to install. Recycled from the cork stoppers industry by-product, Habitus have created some cork mosaic tiles that come in sheets for easy laying. The result is non-slippery, insulating warm surface with sound-proofing qualities. 




  
This product is a NOPHADRAIN sheet drain consists out of a dimpled polystyrene core with a filter fabric bonded to each dimple. The core can be perforated or the back can be provided with an extra geotextile or a pressure dividing film. The result is a durable technical product with the following strong characteristics: Constant drainage capacity under prolonged high loads, Light-weight and thin, High compressive strength (up to 1.100 kN/m2) (making it suitable for many vertical and horizontal applications 
The NOPHADRAIN sheet drain cannot only be used in vertical applications such as a basement and retaining wall but also in horizontal applications like green roof.


Clifford G
LEED 



Friday, November 5, 2010

Indoor Systems 1 - Blog 4

Over the past few weeks, our group has further explored and researched ideas for the cafĂ© that will replace the Banana Boat. As one of the LEED Consultants I have begun to search for finish materials that are both sustainable and good for indoor air quality. I discovered that when a sustainable finish is made from recyclable material, it isn’t always good for indoor air quality. Paint and adhesives used for flooring, particleboard, and MDF can be toxic. Although high-quality air diffusers and ventilation devices can be nitrated into the ceiling to remedy this issue, we are striving to use LEED compliant finishes in our new establishment. Silestone by Cosentino, for example, offers a ‘cleaner safer countertop’ that promises responsible harvesting of raw materials, ecological production, and low to no emissions in air quality upon installation. They are also hard to scratch and come in a wide range of colour.
The nature of shop-fabricated materials like ceiling and floor tiles often makes them fall outside the rules for LEED credits, even though they may achieve the same sustainable goals. Modern ceiling, wall, and floor panel systems, on the other hand, can contribute to a number of different credits under the US Green Building Council’s LEED program. These panel systems are high in recycled content, low in VOC’s, can utilize wood from sustainably managed forests, and do not support mold growth, among other things that are hazardous in a public environment. In addition to finish materials, we have also begun to consider a few sustainable assemblies. For example, if we use curved ceiling panels to create light scoops at glazing with reflective finishes we can make the most of natural lighting.

-Ashley W. (PM)
LEED Consultant/ Interior Designer
 

Saturday, October 23, 2010

Indoor Systems 1 - Blog 3

The new Manitoba Hydro building in downtown Winnipeg is truly an architectural success. After our tour of the facility last week, I left with an enhanced sense of appreciation for the design and construction team. There is an extensive amount of detailed planning required  for a building that targets LEED Gold sustainability certification. In addition to the unique architectural features, what struck me as most impressive was the vast amount of daylight that penetrated through the workspaces. There was little need for artificial light because there are floor to ceiling windows with narrow floor plates on widely spaced floors. Living green roofs have also been planted on the lower exterior surfaces of the building. Green roofs help to diminish the ‘heat island effect’ that results when heat is absorbed at the roof’s surface. According to the Manitoba Hydro website, other benefits of a green roof include additional insulation, protection from solar gain in the summer and heat loss in the winter, as well as protection of the roof membrane.



Not only does this building benefit the environment, but it also has an extremely healthy impact on the occupants. Several atrium and rooftop terraces are seasonally accessible to all employees and can be used for informal meetings or simply as places to relax. Many of the floors express a unique character; such at the Aboriginal floor, which incorporates a sharing circle in the carpet and pressed wheatgrass within 3Form wall partitions. These kinds of features make strong connections to the community and play a role in the revitalization of the city’s downtown area.

-Ashley W. (PM)
LEED Consultant / Interior Designer

Tuesday, October 19, 2010

IDP - electrical systems

During the tour of the Manitoba Hydro Building I payed special attention to the electrical systems.  Light meters throughout the office spaces sense how much light is needed at a specific time.  Lights near the windows may remain dim or off during a bright day, while lights further towards the centre of the building may remain slightly brighter.   These same lights are detected by motion, turning on when the space is occupied and off when it is not.
Lighting can also be controlled by each employee through their personal computer.  Having access to a couple lights near their cubical, an employee can adjust the level of light to meet their needs.  They can also adjust the windows and blinds via computer.  By opening the blinds, the use of artificial lights can be reduced.  If the sun is too bright, the blinds can be closed.  This technology makes it easy to control the amount of electricity used, which, in the Hydro building, must be significantly lower than most Winnipeg office buildings.


The orientation of the building also plays a huge role in limiting the amount of electricity used.  The narrow Hydro building is skewed so that more of the building is facing the south.  This provides more of the interior with natural light, limiting the amount of electricity needed.
Designed using an integrated design process (IDP), the Manitoba Hydro Building is a successful LEED building.  Using this process, our team hopes to design a building that functions sustainably.  It will be important to each share our recently obtained knowledge in order to successfully continue the integrated design process.

Stephanie Hill
- electrical engineer

Monday, October 18, 2010

Manitoba Hydro Visit

The Manitoba Hydro building has become a new Winnipeg landmark.  It sets the standard for a more responsible way of building.  Today we saw how some of the systems we've learned about in class actually work.  


Our tour guide told us that a large percentage of the heating and cooling of the building was supplied from the geothermal system.  The geothermal system is a series of pumps, heat exchangers, ground wells and pipes which are embedded into the structure of the building.  


She also pointed out several features of the windows.  The building incorporated double curtain wall system, allowing fresh air to enter the interior space without creating a draft in the winter while insulating from heat in the summer.  The blinds are automatic and close once the interior is receiving too much heat from the sun.  




The part of the tour that interested me the most was when we visited the south atrium.  Even after having only toured a small portion of the building before we reached that space, the atrium still felt very refreshing.  If the atrium had that much of an impact of me after only a few minutes, I can only imagine how much the employees appreciate the relief of that space.  The fresh air immediately hits you, as does the sunlight and also the water feature.  


Natasha Bargen
Mechanical Engineer

Blog_3 IDP

This week our class went on a tour of the new Manitoba Hydro Building at 360 Portage Ave. I tried to view the tour of the building from the LEED perspective to apply this to our small-scale project of the Banana Boat redevelopment.

One of the interesting aspects of this design was the Integrated Design Process (IDP). This building took 7 years of IDP, to ensure sustainable performance and avoid design solutions that pose later problems. The diagram below shows the various sequence orders according to project needs. 


* This Image was taken from http://www.farm-energy.ca



The IDP process enables a more accurate and thorough way to increase sustainability through energy reduction, GHG reduction, day-lighting, material re-use. Some other Winnipeg projects that used the IDP process were Mountain Equipment Coop and Red River College Princess Campus.

In our small IDP I will push for a reduction in energy through better orientation, windows, walls, roofs, and equipment to reduce fuel and cost for operation, electrical consumption as well as maintenance and replacement costs. In order for the IDP process to be successful a skilled design team, good site characteristics and a skilled construction team.

The overall principle of IDP is to explore potential issues at the beginning of the process hearing viewpoints from various disciplines. This increases the likelihood of a well designed and sustainable building.



Cliff G.
LEED Consultant


Thursday, October 7, 2010

As a group we are focused on maintaining the community centered business model that has garnered Banana Boat the success it has had over the years -  - however we would like to give both the business plan and design a facelift.

Throughout our research we noticed that the employees who work at the surrounding office complex's do not have a healthy option when picking a lunchtime spot, nor does the area of South Osborne have any establishments offering healthy choices for neighbourhood kids jonesing for a treat.

We are proposing to re-appropriate the site as a new eatery - offering have cooked lunches  and snacks with a focus on local ingredients and recipes.

We plan to continue selling frozen treats but instead of soft-serve ice cream we will offer a variety of baked goods as well as introduce smoothie bar to the neighbourhood.

We hope to use the site more efficiently by building up. The first floor will be where orders can be blocked and take-out picked up.  The second-floor will be cafeteria-style seating with servers delivering meals but not taking orders.  The rooftop will serve as a patio space in the summer months where individuals, in the summer months, can interact with the green roof and enjoy their lunch while looking over at the river flowing by.

Through an intensive re-branding strategy that focuses on honoring the Banana Boat such as keeping  the sign out front, we hope to capture new customers as well as maintaining loyal to those who have been visiting the banana boat for years.





- Madi Cash Prof. Interior Designer

Charrette - Electrical Systems

The design charrette allowed our group to make some decisions on the possible use for the site.  Removing the building from the site, we intend to design a new structure to house a healthy cafe.  Since the Banana Boat has been around for so many years, we would like to keep the use for the building similar but provide healthier options.
As we move along in the design process it will be important to work together as a group and ensure that all systems work efficiently together.  As the electrical engineer I intend to work closely with the Leed consultants to produce a building that sustainably manages its power.
Simple lighting methods can be used to reduce the structures impact on the environment.  Separate switches for the artificial lighting near the windows allows them to be switched off when daylight provides enough significant light. Dimmer switches are another cost efficient, sustainable method of controlling interior light.

 Overhang Geometry Diagram

Working with the mechanical engineer we will decide on the orientation of the building that will benefit both heating/cooling as well as lighting.  To achieve a sustainable design it will be important for our group to continue working closely with one another.  Not only will this benefit design, but will also allow each of us to learn more about the other roles.  

Stephanie Hill
Electrical Engineer

Blog_2 Charrette

Our immediate reaction as a group was to redevelop the site as a year-round attraction. Although the building is small it has a patchwork of structures and systems. Considering the site for a complete demolition and construction lead me to think about the sheer amount of waste that is created when buildings are demolished, even in small scale projects such as this. Of course a way to counter this is to deconstruct and reuse various portions of the building. But because this structure is not brick and has very small structural members it would be a challenge to incorporate these into a new, proposed structure.



If our proposal was to become LEED certified it would have to be considered early in the development process. Integrated sustainable strategies would have to become an integral part of our new proposal and include all levels of the project team.

The benefits of attaining LEED certification are lowered operating costs and increased asset value, reduce waste to landfills, conserving energy and water, healthier and safer for occupants, reduce greenhouse gas emissions, qualify for tax rebates, zoning allowances as well as demonstrating environmental stewardship and social responsibility within the Winnipeg community.

For our proposal we would be considered under LEED NC (new construction). The site has some qualities that readily provide for LEED certification such as public transportation and community connectivity. Some other early stage considerations to create a LEED certified building are a green roof to reduce the heat island effect, protecting or restoring habitat, promoting alternative transportation and reducing parking as well as managing storm water in an effective way.

So, even just in the initial phases of design development (our charrette) I realized that producing a LEED qualified construction requires much thought from the very beginning. I think that these sustainable ideals need to be and will be incorporated into all design (LEED certified or not) in order to further the design field in a positive and  more sustainable way. 



Cliff G.
LEED Consultant

Charrette


Our charrette this morning provided us with an opportunity compare ideas.  We discussed these ideas from our specific roles in order to consider every aspect of the design.  We decided to create a cafe style eatery, with healthy menu options including salads and frozen yogurt.


We decided on three goals for our design:


  • to maintain the meaningful rapport with the community that Banana Boat established years ago
  • to respond to the community's needs by creating a design that they would enjoy
  • to design our project using sustainable alternatives
Our design may implement alternative systems to operate the building.  We will consider using a variety of energy sources such as geothermal, hydrogen, solar, wind and bioenergy to support our eatery.  

We will consider the human comfort levels when we complete our design.  A key point on this topic is that humidity is a particularly uncomfortable feeling.  People can generally endure heat rather than humidity.  

Our group will consider using a surface water heat pump system or a hybrid geothermal system as both are efficient and cost effective.  

When we place our building on the site, we will consider the orientation.  We will benefit from prevailing winds, plan for breezes and avoid direct sunlight.  

I enjoyed the charrette process because it was a straight forward, interactive way to hear every group member's opinion and interests.  It was clear example of how creativity prospers when people share ideas!


Natasha Bargen
Mechanical Engineer

photo from www.metaefficient.com/wind_power_u.s._turbines.jpg

Indoor Systems 1 - Blog 2



During the group charrette, the team realized that there are a few initials hurdles to overcome before this project reaches LEED certification. This is largely due to a lack of information about sustainable strategies so we decided that a crucial first step would be to register with the Canada Green Building Council. Registering early in the development process ensures the maximum potential for high building performance. We discussed our thoughts and findings thus far, as well as potential site, climate, and business opportunities. We examined the scope of the work associated with each role then arrived on a consensus that a replacement building would achieve a more efficient and environmentally friendly facility- without having to accommodate the existing systems within a weakening structure. Our new program will serve the environment and bear in mind the needs of the community.

Upon an independent audit of the new building, it can be awarded silver, gold or platinum status due to the number of criteria or “points” it has achieved over a wide range of “green” categories. The project will be evaluated by our team’s oversight of the certification through the scope of: sustainable sites, water efficiency, energy and atmosphere, materials and resources, indoor environmental quality, and innovation in design.

Since the Banana Boat is located within walking distance to public transportation it immediately earns structure points towards LEED certification. We can also earn points towards certification by providing recycling options. One building point can be earned if the site has a green roof covering the total surface area of the roof, less any considerations for solar panels and mechanical equipment. This type of roof would not be an option had we decided to re-work the existing building. With a new structure we can earn this point for having a 100% green roof serving the entire building.

Throughout this course, I continue to learn how very important interiors are to sustainable design, and in turn, how influential sustainability has become on all facets of design and construction.

-Ashley W. (PM)
LEED Consultant / Interior Designer